Roppener Tunnel
Omeras supplied and installed tunnelcladding in Austria. Traffic release of the two-lane Roppener Tunnel took place by mid of December. The tunnel is part of the Inntalautobahn and has been cladded with 4.400 m² enamelled panels. Omeras received the order for production, delivery and installation of the tunnelcladding.
References:
Tunnel
- Roppener Tunnel
Red Box - Dubai
Attention drawn to enamelled panels produced by Omeras. A futurist ambience has been created from the interaction of enamelled surface, glass and steel for Cafè Lafayette in Dubai which was reopened lately. Omeras produced and supplied 4.500 m² enamelled cladding for frontage and interior.
References:
Claddings
- Dubai Mall - Lafayette
Shopping-centre Stadtallendorf -Germany-
Opening of a new shopping centre - Remarkable enamelled panels at the front side of the main building were produced, supplied and installed by Omeras. With an area of 1.000 m2 in bright red colour the building became an eyecatcher at the centre of Stadtallendorf.
Please see our reference pictures:
Claddings
- Shopping centre Stadtallendorf
Dubai Metro - Red Line
Omeras completed Dubai Metro major project against a tight deadline.
All 27 stations included VE plain panels/artwork panels amounting to 27,000m2.
The project included in excess of 2,000m2 of screen printed panels which featured the reproduction of 40 year old local photographs in both Brown + Blue Sepia format and a variety of Wood veneer finishes.
Please see our reference pictures:
Stations
- Station Al Rigga
- Station Al Jafiliya
- Station Burjuman
- Station Financial Centre
- Station Jumeirah Island
- Station Mall of the Emirates
- Station Rashidiya
- Station Union Square